Relief Program• Updated: April 26, 2026

CM Punjab Free Solar Panel Scheme 2026 (Roshan Gharana) — Complete Guide

Detail Information

Official Name CM Punjab Free Solar Panel Scheme / Roshan Gharana Programme

Also Known As Muft Solar Panel Scheme, CM Solar Scheme, Punjab Solar Initiative

Launched By Chief Minister Maryam Nawaz Sharif

Managing Department Punjab Energy Department / PITB

Province Punjab, Pakistan

Target Beneficiaries 100,000 households (Phase 1)

Eligible Consumption 0–200 electricity units per month

System Sizes 550W (0–100 units) | 1,100W (101–200 units)

Cost to Applicant Completely Free (PKR 0)

Official Portal cmsolarscheme.punjab.gov.pk

SMS Registration Send CNIC + Ref. No. to 8800

Helpline 0800-02345 (Toll-Free)

Selection Method Computerized Ballot System

Status (July 2026) Active — Phase 1 ongoing, Phase 2 expected

CM Punjab Free Solar Panel Scheme 2026 (Roshan Gharana) — Complete Guide hero graphic
Status

Active

Deadline

Benefit

Authority

Government of Punjab, Pakistan

ℹ️
Independent Informational Guide: This portal is a private, independent educational resource and is not affiliated with, authorized, or endorsed by the official Government of Punjab, Pakistan or any other government agency. Official registration links and portals are provided directly in our guides for reference.

What is CM Punjab Free Solar Panel Scheme 2026 (Roshan Gharana) — Complete Guide?

The CM Punjab Free Solar Panel Scheme 2026, officially named the Roshan Gharana Programme (meaning "Bright Home" in Urdu), is a flagship renewable energy initiative launched by Chief Minister Maryam Nawaz Sharif under the Government of Punjab, Pakistan. The scheme provides completely free solar energy systems to low-income and low-consumption households across all districts of Punjab province.

Originally announced in 2024, the programme has evolved into a phased 2026 initiative. Phase 1 targets over 100,000 households — specifically those consuming between 0 and 200 electricity units per month. Selected applicants receive a solar kit (panels, inverter, and installation) at absolutely no cost, with selection carried out through a transparent computerized balloting system.

The scheme operates under the Punjab Energy Department, with digital infrastructure managed in collaboration with the Punjab Information Technology Board (PITB). The programme is part of Punjab's broader renewable energy roadmap and aligns with Pakistan's national clean energy targets.

Latest Update — July 2026The CM Punjab Free Solar Panel Scheme Phase 1 is active and distributing solar systems district by district across Punjab. Phase 2 registrations are expected to open later in 2026. Always apply through the official portal only at cmsolarscheme.punjab.gov.pk. Registration is completely free — do not trust any agent or third party.

Important: Applicants must ensure their CNIC is not expired before applying. Verify your CNIC status at nadra.gov.pk before submitting your application.

Objectives & Why the Government Launched This Scheme

Pakistan has faced persistent electricity crises over the past decade — a combination of soaring tariff rates, fuel import costs, and chronic load-shedding has placed enormous financial pressure on low-income families. In Punjab alone, millions of households struggle to pay monthly electricity bills that have roughly tripled since 2020.

The Roshan Gharana Solar Scheme was designed to address this crisis on multiple fronts simultaneously:

  • Financial relief for low-income families: Reducing monthly electricity bills for households spending a disproportionate share of household income on power costs.
  • Promoting renewable energy adoption: Accelerating Punjab's shift toward solar and other clean energy sources, reducing dependence on costly imported fossil fuels.
  • Energy independence at the household level: Providing daytime electricity generation that reduces reliance on the national grid during peak hours.
  • Environmental sustainability: Lowering carbon emissions by replacing grid electricity — generated largely from oil, gas, and coal — with zero-emission solar power.
  • Rural electrification support: Many areas in rural Punjab still face 8–12 hour load-shedding daily; solar kits provide a partial but meaningful alternative source of power.
  • Alignment with national energy policy: The scheme supports the Government of Pakistan's target of generating 60% of electricity from renewable sources by 2030 under the National Renewable Energy Policy.

Context: Why Solar?Pakistan has one of the highest solar irradiance levels in the world, averaging 5–7 peak sun hours per day across Punjab. A 550W solar panel in Punjab can generate approximately 2–3 units of electricity per day under typical conditions — enough to power two ceiling fans and six LED bulbs during daylight hours.

Key Features of the CM Punjab Solar Scheme

FeatureDetails
100% FreeNo cost to the applicant — panels, inverter, and installation are all free
Two System Tiers550W for 0–100 unit consumers; 1,100W for 101–200 unit consumers
Transparent BallotingComputerized draw ensures fair, unbiased selection
Digital RegistrationOnline portal and SMS registration for maximum accessibility
Auto-VerificationCNIC and bill data cross-checked against DISCO databases automatically
CNIC-LinkedOne system per CNIC to prevent duplicate applications
District-wise RolloutDistribution is staggered across districts for organized implementation
Phase-Based ExpansionPhase 1 is active; further phases planned to expand coverage
Status TrackingApplicants can track application and installation status online
SMS NotificationsAutomated updates sent to CNIC-registered mobile number
Official Helpline0800-02345 for queries and complaints (toll-free)

Solar Package — What You Receive Under the Scheme

The government provides two distinct solar package tiers based on your average monthly electricity consumption. Your consumption category is automatically determined when you register — you do not need to self-select a package.
Tier 1 — Low ConsumptionTier 2 — Moderate Consumption
550W1.1kW
For 0–100 units/month consumersFor 101–200 units/month consumers
1 × 550-watt solar panel2 × 550-watt solar panels (1,100W total)
Small solar inverter (charge controller)Inverter with higher capacity
Basic wiring & mounting hardwareBasic wiring & mounting hardware
Professional installation (free)Professional installation (free)
Powers: 2–3 ceiling fans + 6–8 LED bulbsPowers: 4–5 fans + lights + small TV
Daily generation: ~2–3 units (daylight only)Daily generation: ~4–6 units (daylight only)

What Can You Run on the Free Solar System?

Appliance550W System1,100W System
Ceiling Fan (75W)✅ 3 fans✅ 5–6 fans
LED Bulbs (10W each)✅ 6–8 bulbs✅ 10–14 bulbs
Small LED TV (50W)⚠️ Limited hours✅ Several hours
Mobile charging✅ Yes✅ Yes
Air Conditioner (1.5 ton)❌ Not possible❌ Not possible
Refrigerator (full-size)❌ Not possible⚠️ Small fridge only
Water Pump (0.5 HP)❌ Not possible❌ Not possibl

Eligibility Criteria — Who Can Apply?

🏠 Residency🪪 Valid CNIC
You must be a permanent resident of Punjab province. Your CNIC must show a Punjab address. Residents of KPK, Sindh, Balochistan, or AJK are not eligible under this scheme.You must hold a valid, non-expired Computerized National Identity Card (CNIC) issued by NADRA with a Punjab province address. Expired CNICs are rejected
Active Electricity ConnectionMonthly Consumption: 0–200 Units
You must have an active domestic electricity connection registered under a Punjab DISCO — LESCO, MEPCO, FESCO, GEPCO, or IESCO. The connection must be in your name or an immediate family member's name.Your average monthly electricity consumption must be 200 units or less. This is checked against your billing history. Consumers using more than 200 units per month do not qualify.
Sanctioned Load Under 2kWOne Application Per CNIC
Your sanctioned load (the maximum power connection approved for your home, printed on your bill) must be less than 2 kilowatts (kW).Only one solar system is permitted per household per CNIC. Duplicate applications using the same CNIC or reference number are flagged and disqualified.

Eligibility by Consumer Category

Consumer CategoryMonthly ConsumptionEligible?System Provided
Lifeline Category A0–50 units✅ Yes550W system
Lifeline Category B51–100 units✅ Yes550W system
Protected Consumer0–100 units✅ Yes550W system
Unprotected Consumer (Low)101–200 units✅ Yes1,100W system
General Consumer (Medium)201–300 units❌ Not Eligible
General Consumer (High)301+ units❌ Not EligibleC

Who Cannot Apply? — Automatic Disqualification Criteria

The following categories are automatically disqualified from the CM Punjab Free Solar Panel Scheme. These exclusions are checked at the system level and cannot be bypassed:

  • Consumers with monthly usage above 200 units — any consumer whose average consumption exceeds the 200-unit threshold
  • Non-Punjab residents — applicants whose CNIC does not show a Punjab province address
  • Commercial electricity connections — the scheme is restricted to domestic/residential meter types only
  • Sanctioned load of 2kW or above — higher-load connections are excluded from the current phase
  • Electricity thieves / tampered meters — consumers with a history of meter tampering, bypassing, or electricity theft as recorded by DISCOs
  • Defective or faulty meters — meters reported as non-functional or inaccurate
  • Multiple meters at a single address — properties with more than one electricity meter registered at the same location are disqualified
  • More than 3 late payments in the last 12 months — consumers with a poor bill payment history in the past year
  • Duplicate CNIC applications — if the same CNIC is used to submit more than one application
  • Already benefitted from the scheme — households that received a solar system in an earlier phase are not eligible again

🚫 Beware of FraudThe CM Punjab Solar Scheme is 100% free. If anyone — including agents, brokers, or individuals claiming to be government representatives — asks you to pay money for registration, processing, or installation, it is a scam. Report fraud to the Punjab Government helpline: 0800-02345.

Required Documents for CM Punjab Solar Scheme Application

DocumentDetailsMandatory?
1CNIC (Computerized National Identity Card)Valid, non-expired CNIC issued by NADRA. Must show Punjab address. Have your 13-digit CNIC number ready.✅ Mandatory
2Electricity Bill (Reference Number)Your most recent electricity bill. You need the 14-digit reference number printed in the top section of the bill. This is your Consumer ID / Reference No.✅ Mandatory
3Registered Mobile NumberThe mobile number registered with NADRA against your CNIC. SMS notifications and OTPs will be sent to this number.✅ Mandatory
4Proof of ResidenceMay be requested during physical verification. Can include property documents, rental agreement, or utility bill in your name.⚠️ Verification Stage
5Family Registration Certificate (FRC)May be required if the electricity connection is in another family member's name.⚠️ If Required

How to Find Your 14-Digit Electricity Reference Number

The 14-digit reference number (also called Consumer Reference Number or Consumer ID) is found on your electricity bill. Look for a number printed in the top section labeled "Reference No.", "Ref No.", or "Consumer ID." This number does not change across billing months — it is the permanent identifier for your electricity connection.

💡 Lost Your Bill?If you don't have a recent electricity bill, you can retrieve your 14-digit reference number by visiting your DISCO's official online bill portal (e.g., LESCO, MEPCO, FESCO online bill checker) using your meter number or consumer ID. Alternatively, visit your nearest DISCO customer service center.

How to Apply for CM Punjab Solar Scheme Online — Step-by-Step

  1. Prepare Your DocumentsHave your valid CNIC (13-digit number ready) and your most recent electricity bill (with the 14-digit reference number visible) before opening the portal. Make sure the mobile number linked to your CNIC is active and receiving messages.
  2. Visit the Official PortalOpen a web browser on your phone or computer and navigate to cmsolarscheme.punjab.gov.pk. This is the only official government portal. Do not use any third-party website or agent to register.
  3. Enter Your CNIC NumberOn the registration page, enter your 13-digit CNIC number (without dashes). The system will verify your identity and check your Punjab address against NADRA records.
  4. Enter Your Electricity Reference NumberEnter your 14-digit electricity bill reference number. The system automatically retrieves your consumption history, sanctioned load, and connection status from DISCO databases.
  5. Automatic Eligibility VerificationThe portal runs an instant eligibility check. If you meet all criteria (Punjab CNIC, 0–200 units, load under 2kW, active connection, no past violations), your application is accepted. If you do not meet any criterion, the system shows the specific reason for rejection.
  6. Receive Your Reference NumberUpon successful submission, you receive a unique application reference number via SMS. Save this number — you will need it to track your application status. You should also receive an on-screen confirmation.
  7. Wait for Balloting ResultsYour application enters the computerized ballot pool for your district. Balloting is conducted in phases. You will receive an SMS notification when your district's ballot is complete. Check the portal regularly using your CNIC or reference number.

⚠️ Important Tips for Online Registration

  • Always apply during low-traffic hours (early morning) to avoid portal slowdowns
  • Double-check your CNIC and reference number before submitting — errors cause rejection
  • Do not submit multiple applications; duplicate entries are automatically flagged
  • Ensure your registered mobile number (linked to CNIC via NADRA) is active
  • Save or screenshot your confirmation and reference number immediately after applying

How to Register via SMS — Send to 8800

For applicants without reliable internet access, the Punjab government provides an SMS-based registration option. This is equally valid and produces the same result as online registration. SMS Registration Format 📱 SMS Format Type: Send to: 8800 Example: 3510123456789 12345678901234 Type your 13-digit CNIC number, leave a space, then type your 14-digit electricity reference number Send this SMS to 8800 from the mobile number registered against your CNIC You will receive an acknowledgement SMS with your application reference number Standard SMS charges apply; registration itself is free
Registration MethodHowWho It's ForCost
Online PortalVisit cmsolarscheme.punjab.gov.pkAnyone with internet accessFree
SMSCNIC + Ref No. to 8800Without reliable internet; rural areasStandard SMS charge
Bank of Punjab BranchesVisit nearest BOP branch for assisted registrationElderly, digitally challenged applicantsFree
Government Facilitation CentersPunjab Service Delivery Centers / Citizen Facilitation CentersWalk-in assistanceFree

How to Check Your CM Punjab Solar Scheme Application Status

After submitting your application, you can monitor its progress through several channels. The selection process is phased, so not all eligible applicants are notified at the same time. Visit the Official PortalGo to cmsolarscheme.punjab.gov.pk and look for the "Check Status" or "Application Status" option on the homepage. Enter Your CNIC or Reference NumberInput your 13-digit CNIC number or your application reference number received at the time of registration. View Your StatusThe system will display your current application status. Common statuses include: Application Received, Under Review, Selected in Ballot, Physical Verification Scheduled, Installation Scheduled, Completed, or Rejected.
Status ShownWhat It MeansAction Required
Application ReceivedYour application has been submitted successfully and is pending reviewWait — no action needed
Under Review / VerificationYour data is being cross-checked against DISCO and NADRA recordsWait — ensure your registered number is active
Eligible — Ballot PendingYou passed verification and are in the ballot queue for your districtWait for ballot results
Selected in BallotCongratulations — your application was drawn in the computerized lotteryAwait physical verification visit
Physical Verification ScheduledGovernment officials will visit your address to confirm eligibilityBe present at home; keep documents ready
Installation ScheduledYour installation date has been confirmedEnsure roof access; be present at home
Completed / InstalledYour solar system has been installed successfullyNone — enjoy your free solar energy!
RejectedYour application did not meet eligibility criteriaCheck the reason; apply in the next phase if criteria are corrected
Waiting ListYou passed the ballot but are on standby in case selected applicants fail verificationKeep information updated; await confirmation

Balloting Process — How Winners Are Selected

Because demand for the CM Punjab Free Solar Panel Scheme far exceeds the 100,000 systems available in Phase 1, the government uses a computerized transparent balloting system to ensure fair and unbiased selection among all eligible applicants.

How the Ballot Works

  • All verified eligible applicants are entered into a digital ballot pool, segmented by district
  • A computerized randomization algorithm draws the required number of winners from each district's pool
  • The process is district-by-district and phased — some districts complete their ballot before others
  • Results are announced publicly and can be checked on the official portal using your CNIC
  • Selected applicants receive an SMS notification and see their status updated to "Selected in Ballot" on the portal
  • Applicants not selected in Phase 1 remain in the database and may be considered for Phase 2 without re-registering

ℹ️ What Happens if You're Not Selected?If your application was not drawn in the Phase 1 ballot, do not lose hope. The government has announced additional phases for 2026. Applicants from Phase 1 who were not selected are automatically carried over to the next phase's ballot pool. Keep your registered number active to receive updates.

District-wise Rollout

Solar system distribution under the Roshan Gharana Scheme is not simultaneous across all of Punjab. It proceeds district by district, with priority given based on administrative planning, DISCO coverage zones, and logistical capacity. All 36 districts of Punjab are covered under the scheme across phases.

Physical Verification Process

After being selected in the ballot, applicants go through a physical verification stage before installation. This step ensures that selected applicants genuinely meet all criteria at the ground level.

What Happens During Physical Verification?

  • Government-authorized field teams visit the applicant's registered address
  • Officials confirm that the residence matches the address on the CNIC and electricity bill
  • The electricity meter is inspected to verify it is functional, unmodified, and correctly registered
  • Consumption patterns are reviewed on-site if needed
  • No additional documents are typically required beyond what was submitted at registration
  • Verification typically takes 2–3 weeks after ballot selection

⚠️ Be Present During VerificationIf field officials visit and no one is home, your application may be placed on hold. Ensure someone is available at your registered address, and keep your original CNIC and a copy of your electricity bill accessible during the verification period.

Installation Process & Timeline

Once physical verification is successfully completed, the solar system installation is scheduled. The government uses authorized installation teams to carry out all work.

Installation Steps

  1. Installation SMS NotificationYou receive an SMS informing you of the scheduled installation date. Your portal status updates to "Installation Scheduled."
  2. Site AssessmentThe installation team assesses your roof for suitability — angle, shading, load-bearing capacity. A flat or slightly pitched roof with clear southern exposure is ideal.
  3. Panel MountingSolar panels are mounted on brackets fixed to the roof. The team ensures panels are angled optimally to capture maximum sunlight during Punjab's solar hours.
  4. Inverter & WiringThe inverter is installed (typically inside the home or in a sheltered location) and connected to the panels and your existing domestic circuit.
  5. System TestingThe team tests the system to confirm panels are generating power and the inverter is functioning correctly.
  6. HandoverThe installation is handed over to the homeowner. Basic usage instructions are explained. Your portal status updates to "Installation Complete."

Distribution Companies (DISCOs) — Which Covers Your Area?

The CM Punjab Free Solar Panel Scheme covers consumers connected to all major electricity distribution companies (DISCOs) serving Punjab. To register, you need to know your DISCO — it is printed on your electricity bill.
DISCOFull NameCoverage Area (Major Districts)
LESCOLahore Electric Supply CompanyLahore, Sheikhupura, Kasur, Okara, Nankana Sahib — 6.5 million consumers
MEPCOMultan Electric Power CompanyMultan, Bahawalpur, Sahiwal, DG Khan, Rahim Yar Khan, Vehari, Khanewal — 5.8 million consumers
FESCOFaisalabad Electric Supply CompanyFaisalabad, Jhang, Sargodha, Chiniot, Toba Tek Singh, Mianwali, Khushab, Bhakkar — 4.8 million consumers
GEPCOGujranwala Electric Power CompanyGujranwala, Sialkot, Narowal, Gujrat, Hafizabad, Mandi Bahauddin — 3.8 million consumers
IESCOIslamabad Electric Supply CompanyIslamabad (ICT), Rawalpindi, Attock, Jhelum, Chakwal — 4.2 million consumers

Benefits of the CM Punjab Free Solar Panel Scheme

BenefitDetails
💰 Reduced Electricity BillsA 550W system generating 2–3 units daily can save households PKR 600–1,500 per month, depending on tariff slab
🔋 Daytime Power During Load-SheddingSolar generation continues independently during scheduled and unscheduled load-shedding hours
🌱 Zero Carbon EmissionsSolar energy produces no greenhouse gases, reducing the household's environmental footprint
🆓 Zero Upfront Cost100% free — panels, inverter, and installation are provided at no cost to the beneficiary
📈 Long-term SavingsSolar panels have a 20–25 year operational lifespan, providing lasting bill reductions
🏠 Improved Living StandardsConsistent daytime power for fans and lights improves comfort and quality of life for low-income families
🇵🇰 National Energy IndependenceReduces pressure on the national grid and Pakistan's fuel import bill
📱 Simple RegistrationOnline and SMS-based registration makes the scheme accessible to both urban and rural households

Pros & Cons — An Honest Assessment

✅ Advantages❌ Limitations
Completely free for eligible householdsSystem sizes (550W–1.1kW) are very small
Meaningful bill reduction for the lowest-income consumersNo battery storage — no power after sunset
Transparent computerized selection processNo net metering — surplus solar is wasted
Simple SMS and online registrationCannot run ACs, refrigerators, or pumps
Covers all Punjab districtsComponent quality varies at government procurement scale
Reduces grid load and load-shedding pressureNo ongoing maintenance or warranty support structure
Promotes clean energy awarenessLimited to 100,000 units in Phase 1
Phase-based expansion planned for wider coverageLong wait times due to district-wise phased rollout

Common Reasons for Rejection & How to Avoid Them

Rejection ReasonHow to Avoid / Fix
Monthly consumption above 200 unitsCheck your last 6 bills; if your average is above 200 units, you do not qualify for this phase
CNIC showing non-Punjab addressUpdate your CNIC address at NADRA before applying if you have moved to Punjab
Sanctioned load 2kW or aboveThis is printed on your bill; higher-load connections do not qualify for Phase 1
Electricity connection is commercial, not domesticThis scheme is for residential meters only
History of electricity theft / tampered meterDISCO records are cross-checked; clear any outstanding issues with your DISCO first
More than 3 unpaid or late bills in 12 monthsEnsure your bills are paid on time; clear any outstanding dues before applying
Incorrect reference number enteredDouble-check the 14-digit number on your bill before submitting; even one wrong digit causes rejection
Duplicate application (same CNIC)Apply only once; multiple submissions from the same CNIC are automatically flagged
Connection in arrears / disconnectedRestore your connection and clear arrears before applying
Registered mobile number inactiveEnsure the SIM registered against your CNIC at NADRA is active to receive OTP and notifications

Common Myths vs Facts About the Punjab Solar Scheme

❌ Myth✅ Fact
"You need connections to get selected"Selection is entirely computerized ballot — no human intervention in the draw
"There is a registration fee"Registration is 100% free. Anyone asking for payment is a fraudster
"The scheme is only for Lahore residents"The scheme covers all 36 districts of Punjab province
"Net metering is included"No — these are off-grid/basic hybrid kits; net metering is not included
"The system can run air conditioners"No — a 550W or 1,100W system cannot power an air conditioner (which requires 1,500–2,000W+)
"Applying through agents speeds up the process"Agents have no official role. Using an agent puts you at risk of fraud and does not improve your chances
"The solar system runs at night"Without battery storage, the system only generates power during daylight hours
"One family can apply multiple times for more systems"Only one system per household/CNIC is permitted
"Commercial connections are eligible"Only domestic (residential) connections qualify

Final Verdict — Should You Apply for the CM Punjab Solar Scheme?

If you consume 200 units or less per month and meet the Punjab residency criteria — yes, apply immediately. There is no cost, no risk, and a genuine opportunity to reduce your electricity bills and gain partial energy independence for free. The scheme is legitimate, government-run, and fully digital.

The Roshan Gharana Programme is not a solution to high electricity bills for heavy consumers — a 550W or 1,100W kit was never designed to run air conditioners or replace your grid connection. But for the millions of low-income Punjab households whose electricity bills are driven by fans and lights, this free solar system represents a meaningful and lasting form of financial relief.

Act fast. Phase 1 targets 100,000 households across all of Punjab. Register through the official portal or SMS before your district's quota fills. The scheme is real, it is free, and it is ongoing — but spots are limited.

Frequently Asked Questions (FAQs)

Share your thoughts about this scheme

Share your opinion, ask a question, or leave feedback about this page.

Recent Comments

Loading comments...

Related Schemes

Other Relief programs you may qualify for

BISP (Benazir Income Support Programme)ONGOING
PUNJAB
Relief

BISP (Benazir Income Support Programme)

Direct cash support for low-income families under the federal BISP program....

View Details
PM Ramzan Relief Package 2026ONGOING (May-June 2026)
PUNJAB
Relief

PM Ramzan Relief Package 2026

One-time Ramzan support for low-income families in 2026....

View Details
ADWC Punjab 2026 – Complete Guide to the Free Assistive Devices and Wheelchair ProgramActive
PUNJAB
Relief

ADWC Punjab 2026 – Complete Guide to the Free Assistive Devices and Wheelchair Program

The ADWC Punjab program has been active and expanding its reach as of 2026. The Punjab Government has increased the annu...

View Details
CM Punjab Solar Tubewell Scheme 2026 – Subsidy, Apply Online & Farmer BenefitsClosed
PUNJAB
Relief

CM Punjab Solar Tubewell Scheme 2026 – Subsidy, Apply Online & Farmer Benefits

The CM Punjab Solarization Program for Agri Tubewells is a major step by the Government of Punjab under the leadership o...

View Details

Don't Miss the Application Deadline

Check the deadline for this scheme and track all application deadlines →

View Deadline Tracker